Anyone investing heavily this year??

How much money did you lose/gain this past week?


  • Total voters
    30
  • Poll closed .

Helico-pterFunk

Rising Star
BGOL Legend

RoomService

Dinner is now being served.
BGOL Investor

Robinhood’s stock dives after disclosing receipt of ‘Wells Notice,’ with SEC alleging securities violations​

Shares of Robinhood Markets Inc. HOOD, +1.93% sank 2% in premarket trading Monday, after the traded-app operator disclosed that on May 4 it received a “Wells Notice” from the U.S. Securities and Exchange Commission. Following a previously disclosed SEC investigation into Robinhood’s cryptocurrency listings, custody of cryptocurrencies and platform operations, the “Wells Notice” states that the SEC has advised Robinhood that it made a “preliminary determination” to recommend the SEC file an enforcement action alleging securities violations. “The potential action may involve a civil injunctive action, public administrative proceeding, and/or a cease-and-desist proceeding and may seek remedies that include an injunction, a cease-and-desist order, disgorgement, pre-judgment interest, civil money penalties, and censure, revocation, and limitations on activities,” the company disclosed. The stock has run up 40.9% year to date through Friday, while the S&P 500 SPX, +1.26% has gained 7.5%.

 

HellBoy

Black Cam Girls -> BlackCamZ.Com
Platinum Member
LONG BEACH, Calif.--(BUSINESS WIRE)-- Rocket Lab USA, Inc (Nasdaq: RKLB) (“Rocket Lab”, or “the Company”), a leading launch and space systems company, today revealed it has selected NASA’s historic Stennis Space Center in Mississippi as the location of its engine test facility for its reusable rocket, Neutron.

The Archimedes Test Complex will be located within the larger A Test Complex at Stennis Space Center across a 1 million square foot area for 10 years, with an option to extend the lease for an additional 10 years. The Archimedes Test Complex will include exclusive use and development of existing industrial NASA infrastructure and the Center’s A-3 Test Stand to develop and test Neutron’s Archimedes reusable engines. Rocket Lab has also secured a capital investment incentive from the Mississippi Development Authority to further develop the facilities and infrastructure at Stennis for Neutron. By expanding Stennis Space Center to include the Archimedes Test Complex, Rocket Lab is expected to create dozens of new jobs and make significant capital investments in the state of Mississippi.

Neutron is Rocket Lab’s reusable rocket in development, designed as a cost-effective, reliable, and responsive launch service to help build mega-constellations, deliver large spacecraft to low-Earth orbit, geostationary orbit, and interplanetary destinations, and to support a sustained human presence in space. Neutron will be powered by in-house designed and manufactured Archimedes reusable rocket engines and an advanced upper stage to enable high performance for complex satellite deployments.

Rocket Lab Founder and CEO, Peter Beck, says: “Before rockets flew to the Moon, they first had to go through Mississippi, and as we build a new rocket to reshape space access once again, Stennis is a fitting location for Neutron. Creating a test complex from scratch to the scale and complexity needed to test and develop Archimedes would have had an inconceivably long lead time, so the fact that we’ve secured Stennis and can leverage its existing infrastructure and test stand puts us on the fast-track to Neutron’s first launch. The icing on the cake is having fantastic partners like NASA and the state of Mississippi behind us to bring innovative rocketry, economic development, and new jobs to the Gulf Coast.”

:yes:
Having a completed Archimedes engine on the test stand is an inflection point in Neutron’s development program. Now we’ve entered the home stretch where we breathe fire and refine the engine in preparation for first flight,” said Rocket Lab founder and CEO, Peter Beck. “Often with engine development plans there can be a rush to get a minimum viable product to the stand, after which you have to spend years in redesign and iterative testing to get the performance you need, let alone being able to reproduce it reliably on a large production scale. What we’ve taken to the test stand is very close to a flight-like engine, and with all of our production infrastructure stood up alongside the engine’s development, we’re in a prime position to be able to make quick iterations to Archimedes for a rapid development and qualification campaign. We took the time to not only bring a mature design to the stand that has been thoroughly tested at component level, but to also stand up the experienced team, manufacturing line, and test facilities required to support long term production of Archimedes. This approach has ultimately pushed the first flight to mid-2025 at the earliest, but it’s an approach we believe will deliver the frequent flight rates the market needs quickly after flight one. Designing a brand-new rocket engine to meet the market demand for frequent and reliable launch is complex feat, but it’s something we’ve successfully done before, having launched more than 470 Rutherford engines to space. We look forward to repeating this success with Archimedes.”
 

Madrox

Vaya Con Dio
BGOL Investor
Having a completed Archimedes engine on the test stand is an inflection point in Neutron’s development program. Now we’ve entered the home stretch where we breathe fire and refine the engine in preparation for first flight,” said Rocket Lab founder and CEO, Peter Beck. “Often with engine development plans there can be a rush to get a minimum viable product to the stand, after which you have to spend years in redesign and iterative testing to get the performance you need, let alone being able to reproduce it reliably on a large production scale. What we’ve taken to the test stand is very close to a flight-like engine, and with all of our production infrastructure stood up alongside the engine’s development, we’re in a prime position to be able to make quick iterations to Archimedes for a rapid development and qualification campaign. We took the time to not only bring a mature design to the stand that has been thoroughly tested at component level, but to also stand up the experienced team, manufacturing line, and test facilities required to support long term production of Archimedes. This approach has ultimately pushed the first flight to mid-2025 at the earliest, but it’s an approach we believe will deliver the frequent flight rates the market needs quickly after flight one. Designing a brand-new rocket engine to meet the market demand for frequent and reliable launch is complex feat, but it’s something we’ve successfully done before, having launched more than 470 Rutherford engines to space. We look forward to repeating this success with Archimedes.”
 

Aww Skeet Skeet!

The antithesis of nonsense.
BGOL Investor


I'll be honest, I thought this would've happened a few years earlier (not AI, but $AAPL datacenter chips in general).

Another interesting wrinkle (who knows how true it is). CoWoS (chip on wafer on substrate) packaging is used to build $NVDA and $AMD AI gpus:

"NVIDIA and AMD have purchased all of TSMC's advanced packaging production capacity including CoWoS and SoIC for 2024 and 2025: they're 'fully booked'."


 
Last edited:

RoomService

Dinner is now being served.
BGOL Investor

kdogg3270

Rising Star
BGOL Patreon Investor

SkyWater Technology Reports First Quarter 2024 Results​


i was all set to cop (price is really low at the moment) but gotta wait for the market to open tomorrow
 
Top